# How do I use TOAD for SQL Server with SSDT database projects?

**URL:** <https://forums.toadworld.com/t/how-do-i-use-toad-for-sql-server-with-ssdt-database-projects/39227>\
**Category:** Toad for SQL Server\
**Created:** [March 20, 2017, 11:09am UTC](https://forums.toadworld.com/t/how-do-i-use-toad-for-sql-server-with-ssdt-database-projects/39227 "2017-03-20T11:09:18Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![Kevin.Nechodom\_61124](https://avatars.discourse-cdn.com/v4/letter/k/5e9695/32.png) [@Kevin.Nechodom\_61124](https://forums.toadworld.com/u/Kevin.Nechodom_61124)\
**Post date:** [March 20, 2017, 11:09am UTC](https://forums.toadworld.com/t/how-do-i-use-toad-for-sql-server-with-ssdt-database-projects/39227/1 "2017-03-20T11:09:18Z")

</div>

We have a substantial amount of work on a database project that is managed within SQL Server Data Tools (under VS2015), and stored in TFS. When I look to see how TOAD can use TFS, it appears to start from the standpoint of the database, leaving our changeset history orphaned if we switch over to TOAD.

I am a TOAD newbie, so I realize I am not speaking the right language, but I would appreciate any pointers on how to accomplish this. Is there a way to have TOAD side-by-side with VS2015, so that both can reference the same TFS objects, or am I looking at a cut-over project?

Thank you, Kevin
