Hi,
I would like to know if is possible somehow to change order of my open editors tabs under current connection w/o closing all files inside each tab?
For example I would like to exchange order so tab MyEditor1 would be before MyEditor2.
![]()
Hi,
I would like to know if is possible somehow to change order of my open editors tabs under current connection w/o closing all files inside each tab?
For example I would like to exchange order so tab MyEditor1 would be before MyEditor2.
![]()
Sorry for the slow reply here.
We have a lot of rules about how window bar buttons are sorted.
If the window bar buttons are sorted (windows bar -> right-click -> window bar button order), then the types of windows will first be sorted in whatever order you told it to (for example schema browser vs session browser vs editor).
If you have multiple windows of the same type, they are 2nd sorted so they are in the same order as their connections. Connections can be sorted by connection bar -> right-click -> connection bar button order. If you don't do that, they are listed in order of connection time.
if you have multiple windows of the same type, and of the same connection, they are lastly sorted by the order in which they were opened.
Sorting them alphabetically, or manually dragging/dropping to sort is not possible.